St John Fisher Catholic High School

St John Fisher Catholic High School, Dewsbury
Project- levelling + drainage of school playing fields 16000m²
Client- Kirklees M.B.C.
Design- Stuart Pool Consultancy
Contract Supervisors- Aedas

This project involved the transformation of an undulating and poor draining school field into good quality free draining pitches capable of withstanding a high degree of usage. Sand slits to be introduced following establishment.

  • Surface cultivation
  • Surface level improvements
  • Install lateral drainage @ 5m centres
  • Sand amelioration 1200 tonnes
  • Final trim
  • Seeding works
  • Establishment
  • Installation of sand slits @ 1m centres

This project was completed and signed of in 2008.